More bridge delays this weekend

Published on July 30th, 2010

By SEWARD PHOENIX LOG STAFF

Share via G-Mail Share via Yahoo Mail Share via Delicious Digg this article Share via Fark Share via Stumbleupon Share via Twitter Share via Facebook Change article font size Print this article Email this article Create a Shortlink for this article Send this article to Promobot

Emergency work will be done on Ptarmigan Creek Bridge on the Seward Highway beginning this evening, according to the City of Seward.

The work may extend through the weekend.

The bridge will remain open to one lane traffic, controlled by flaggers, throughout the period of this work.

DOT/PF will erect sign boards on the Seward and Anchorage sides of the bridge to alert drivers of the possible delay at the bridge.

At this time there are no weight restrictions on the bridge except for over size loads.

More information will be posted as it becomes available.


Seward Phoenix Log Staff can be reached at editor@alaskanewspapers.com, or by phone at 907-348-2428

Popular Stories


Copyright 2010

The Seward Phoenix LOG is a publication of Alaska Newspapers, Inc. This article is © 2010 and limited reproduction rights for personal use are granted for this printing only. This article, in any form, may not be further reproduced without written permission of the publisher and owner, including duplication for not-for-profit purposes. Portions of this article may belong to other agencies; those sections are reproduced here with permission and Alaska Newspapers, Inc. makes no provisions for further distribution.